    The sign is for the left hand side of the road under the bridge which only has height clearance for single deck vehicles. Double deckers are supposed to go against the one-way system through the right-hand side where there is a sort of dug-out area that increases the height clearance. Maybe the answer would be to excavate the other side like this as well.